The best custom kitchens are decided in a certain order: how you'll use the room, what's included, your budget range, the layout, appliances, storage, and only then the finishes. Most expensive surprises come from doing it the other way round, falling for a door colour first and then finding out the room, the budget or the plumbing can't support the plan.
Here's the sequence we walk clients through, and why each step comes before the next.
1. Start with how you actually live
Before anyone draws a cabinet, get clear on how the room needs to work. A few questions make a big difference:
- How many people cook at once, and how often?
- Where do groceries land, and where do school bags, mail and keys end up?
- Do you entertain often? Is it a few friends at the island, or forty people over the holidays?
- Who else uses the kitchen: kids doing homework, someone working from home, a parent who'd find a lower counter easier?
The answers shape the room in very real ways. For example, the National Kitchen & Bath Association recommends a work aisle of at least 42 inches for one cook and 48 inches for more than one (NKBA Kitchen Planning Guidelines). A two-cook household that plans like a one-cook household feels the difference every day.
2. Decide what's in scope: the kitchen alone, or the rooms around it?
Many kitchen projects end up touching the pantry, mudroom, laundry, a bar or the living-room wall next to the kitchen. Deciding this at the start, rather than halfway through, matters for two reasons.
First, it lets one design language carry through the home: the same fronts, the same proportions, the same quality of hardware. Second, it lets everything be planned, ordered and installed as one coordinated project rather than a series of add-ons.
One design language can carry from the kitchen into the living room.
You don't have to do every room now. But it helps to know which ones you might do, so today's kitchen doesn't box in tomorrow's laundry room.
3. Set an honest budget range before the design starts
This is the step people most want to skip, and the one that saves the most time. A design created without a budget range tends to come back either too modest or out of reach, and then everyone starts over.
You don't need an exact figure. You need a range you're comfortable with, shared openly with whoever is designing your kitchen. The things that move the cost most are:
- the size of the room and the amount of cabinetry
- what's inside the cabinets (drawers and pull-outs vs. plain shelves)
- the fronts and finishes you choose
- countertops and appliances
- what the room itself needs: moving plumbing or gas, new electrical, walls, flooring or lighting
A good kitchen company will tell you early, and plainly, whether your plan and your range fit together. If they don't, that's a useful sign too.
4. Lock the layout, and know what will move
The layout is where decisions get expensive to change later. Moving a sink means moving plumbing. Moving a range can mean new gas lines and venting. An island with a cooktop or outlets needs power run under the floor. Taking out a wall can be structural.
Every island outlet, sink and cooktop is a layout decision first.
So settle two things together: where everything goes, and what has to move to get there. That is also the moment to sort out permits. In Ontario, almost all electrical work must be reported to the Electrical Safety Authority (ESA) with a notification of work, filed by whoever does the work, usually a Licensed Electrical Contractor. A building permit is separate, and you may need both (ESA).
This is where our founder and Lead Project Consultant, Slobodan Jelenic, makes the biggest difference. Before bobi Kitchens, he spent years renovating and building homes, and he has run his own electrical contracting business as a Master Electrician since 2009. He knows what a house will and won't allow, which decisions to settle before anything is ordered, and which trades to bring in when a plan calls for one.
“The kitchens that run smoothly are the ones where the layout, plumbing and electrical plan are decided together, not after the cabinets arrive.”
Slobodan Jelenic, Founder & Lead Project Consultant
5. Choose your appliances before the cabinets are finalized
Cabinets are built around appliances, not the other way around. Fridge width, built-in or panel-ready models, wall ovens in a tall unit, a steam oven, a wine fridge or a range hood: each affects the cabinet sizes around it.
You don't have to buy appliances early. But pick the actual models, with their specification sheets, before your cabinet design is final. Changing a fridge after the cabinets are ordered is one of the most common, and most avoidable, headaches in any kitchen project.
6. Plan storage from the inside out
This step is easy to rush, and it's where a kitchen either works beautifully or quietly frustrates you for years.
Make a simple list of what actually lives in your kitchen: pots and lids, baking trays, spices, small appliances, lunch boxes, the recycling. Then decide how you want to reach each thing. Deep drawers for pots, a pull-out for spices, internal drawers behind a tall door, a dedicated spot for waste sorting.
Deep drawers and pull-outs
Internal drawers behind a tall door
When this list exists before the design is finalized, the cabinets can be planned around your things instead of your things being squeezed into the cabinets.
7. Then choose the finishes
Now the fun part: fronts, colours, wood or matte, handles or handle-free, countertop, lighting. Leaving this until last isn't about making it less important. It's about choosing finishes for a kitchen that already works.
CHESTER Sahara by Nolte. Colours and textures like these are best judged in person.
If you can, choose finishes in person. Colours and textures look different under daylight, under warm lighting at night, and next to the countertop stone you have in mind. A matte front, a wood grain or an anti-fingerprint surface is far easier to judge with your hand on it than on a screen.
When to start talking to a kitchen company
Earlier than most people expect, especially for a new build or a large renovation. Bringing a kitchen company in during the layout stage (steps 3 and 4), rather than after the walls are framed, gives you more choices and fewer compromises.
It matters for factory-built cabinetry in particular. Our Nolte Küchen cabinetry is made in Germany and arrives pre-assembled, so the design is finalized before it's ordered. That's one more reason to make these decisions in order. The more settled your plan, the smoother everything after it.
A quick checklist
- How many cooks, and how the room is really used
- Which rooms are in scope, now and later
- A budget range you're comfortable sharing
- Final layout, and a list of what moves (plumbing, gas, electrical, walls)
- Permits: building and ESA electrical
- Appliance models chosen, with specification sheets
- Your storage list
- Finishes, chosen in person
Frequently asked questions
Should I choose my countertop before my cabinets?
Choose the cabinet layout first, then the countertop and fronts together, because you'll see them side by side every day. Once you've chosen your stone company, we'll work with them directly so your countertops fit your cabinetry and your schedule. If you don't have one in mind, we're happy to recommend one we trust.
Do I need a permit for a kitchen renovation in Ontario?
It depends on the work. Almost all electrical work needs an ESA notification, and plumbing, gas or structural changes usually need a building permit from your municipality. Check with your city's building department and your contractors before work starts.
I'm building a new home. When should the kitchen be designed?
Ideally while the floor plan is still being finalized, so windows, plumbing and electrical can be placed around the kitchen rather than the kitchen squeezed around them.
What should I bring to a first design appointment?
A floor plan or rough measurements, photos of the current space, your budget range, any appliance models you're considering, your storage list and a few pictures of kitchens you love.